WE PROVIDE
CASE STUDY ANSWERS
ASSIGNMENT SOLUTIONS
PROJECT REPORTS AND THESIS
ISBM / IIBMS / IIBM / ISMS / KSBM / NIPM
SMU / SYMBIOSIS / XAVIER / NIRM / PSBM / NSBM ISM / IGNOU / IICT / ISBS / LPU / ISM&RC / NMIMS ISBS / MANIPAL / GARUDA / HIMALAYA / IMT / IC MIND / IACT / UPES / IIMRT
MBA - EMBA - BMS - GDM - MIS - MIB
DMS - DBM - PGDM - BBM – DBA – PGDM
ARAVIND
09901366442 – 09902787224
Software
Project Management
1. What is LOC? Explain disadvantage of this method
as a measure of size of a software. Compare Halstead’s length and volume measures
of size with LOC measure by giving suitable example.
2. What is the use of the following tools in
Software Project Scheduling? Also, mention its significance:
i) WBS
ii) CPM
iii)PERT charts
3.
Suppose you are
developing a software product in the organic mode. You have estimated the size
of the product to be about 1,00, 000 lines of code. Compute the nominal effort
and development time.
4. What is a Software Process? Why it is required to
model a software process? List various tools available for process modeling.
Explain any one tool with an example.
5. Define term resource in Project Management. What
types of resources are required to develop a software project? Explain the
significance of resource allocation phase.
6. What is significance and role of Project Closure
Analysis in Software Project Management? Write steps to perform closure
analysis.
7. What is Software Reliability? How it is different from Hardware
Reliability?
8. Why is it important to track the progress of a
project? Explain various monitoring and controlling techniques to track the
project progress.
Software
Project Management
1. How does the requirement process can be
explained?
2. What is step wise project planning?
Draw a diagram for an overview of stepwise planning.
3. i) Write the basis for software
estimating
4. What is network planning model? How to
formulate network model?
5. Explain the method of estimating the
duration of an activity.
6. Explain top-down project schedule plan.
7. Explain the functions and
responsibilities of software configuration management.
8. Discuss in detail any one tool for
project management.
9. Discuss risk management in software
development.
10. Write a case study of a Software Project
Management System for an automated education system which contains the
requirement, gathering, planning, Implementation, Test Cases and Staffing.
Strategic Management
- What is the best option, in your view, for
DD?
2. Analyse the SWOT factors the DD has.
3. Why do you think that the proposed alternative is the best?
a)
What is SWOT Analysis?
b)
What are the strength of PTC?
c)
What are the weaknesses of PTC for entering into the branded snacks market?
d)
What kind of marketing strategy was formulated and implemented for Ringo?
What
else need to be done by Ringo so as to enlarge its market?
i.
What do you understand by the term Vision? What is the difference between
‘Vision’ and ‘Mission’? What vision Dr. Sukumar has at the time of inheritance
of Dey’s lab? Has it been
achieved?
ii. For growth what
business strategy has
been adopted by Dr. Sukumar?
iii.What is the marketing strategy
of Dr. Sukumar to overtake its competitors?
iv.
In your opinion what could be the biggest weakness in Dr. Sukumar’s business
strategy?
1. Identify and discuss briefly, the three themes
of strategy implementation of activating strategies, managing change and
achieving effectiveness in the case of Deepak Nitrite.
2. picking up data from the case, demonstrate how
formulation and implementation of strategy are interdependent.
No comments:
Post a Comment